Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the grand-media domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/garrosafruits.com/httpdocs/wp-includes/functions.php on line 6131
Facilities

Facilities

Our new packing house, constructed in 2015, has around 3000 square meters of total surface, a cold storage capacity of 1000 tones and a production capacity of 100 tones per day. Thanks to these facilities, we are able to prepare with guarantee all our field production, that is growing year by year and it is at the moment in a few million kg.

Scroll to Top